As the buildings infrastructure could not pretty cope with the warmth displacement in the rental chiller we supplemented new air by way of adaptable Ducting connected to our high pressure rental air managing units which had been positioned into the awesome air facet in the loading bay.IMPORTANT NOTICE: Duty assignments obtainable at time of supply